My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PARK
>
248
>
2900 - Site Mitigation Program
>
PR0542235
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 2:44:24 PM
Creation date
5/4/2020 2:26:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542235
PE
2960
FACILITY_ID
FA0024262
FACILITY_NAME
CANEPA CAR WASH
STREET_NUMBER
248
Direction
E
STREET_NAME
PARK
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
248 E PARK ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Harlin Knoll [EH] <br /> From: William Little <wlittle@advgeoenv.com> <br /> Sent: Friday, February 22, 2013 4:24 PM <br /> To: Harlin Knoll [EH]; Nuel Henderson [EH] <br /> Su rmarty@advgeoenv.com <br /> Subject: 248 East Park and 625 North San Joaquin Street <br /> Mr. Harlin Knoll- <br /> In order to accommodate your request for an updated status at 248 East Park Street, the follow <br /> schedule is provided. <br /> The remediation system installation at 248 East Park Street has begun. AGE has prepared the site <br /> with a common earth trench excavation for electrical and gas line service installation, as required by <br /> code and prepared the designated equipment containment pad installation area. Base rock has been <br /> delivered. <br /> AGE has procured sub-contractor bids and requested permits for the electrical, plumbing and <br /> building. The finalization of the permit will allow for utility and equipment installation. AGE anticipates <br /> a permit issuance within the next two weeks or installation of the utilities/infrastructure and inspection <br /> by the end of the quarter. Start-up can be initiated with the AIR board once equipment is installed. <br /> Please call me if you have any questions. <br /> Sincerely, <br /> William R. Little <br /> California Professional Geologist 7473 <br /> Oregon Registered Geologist G2254 <br /> Washington Licensed Geologist 2778 <br /> Advanced GeoEnvironmental Inc. www.adv-qeoenv.com <br /> Stockton • Santa Rosa • Monterey • Brea • Spokane • Reno • Dallas <br /> (800)511-9300 <br /> This email/fax message is for the sole use of the intended recipient(s)and may contain confidential and privileged information.Any unauthorized review, <br /> use,disclosure or distribution of this email/fax is prohibited. If you are not the intended recipient,please contact the sender by email/fax and destroy all <br /> paper and electronic copies of the original message. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.