Laserfiche WebLink
Figure 3, <br /> Hydragraph <br /> -S <br /> BMW-1 M MW 2 <br /> —0—MW-3 MW4 <br /> MW-5 A MW-6 <br /> -l0 ----------------------------------- ----- --- -MW-7 <br /> I <br /> -15 ---------------------- ---------------------- <br /> O <br /> -20 ---------- ----------------------------------- <br /> -------------------------------------------------------------------------- <br /> Approximate elevation of top of well screen for <br /> monitoring wells MW 4 through MW 7 Well <br /> screen interval for MW4 through MW 7 <br /> 3 -25 -------- ----------------------------------------------------------- approxunately40to60feet BGS ------------------------ <br /> IX -30 - -------------------------------------------------------- <br /> Approxtmate elevation of top of well screen <br /> for monitoring wells MW-1 MW 2 and MW <br /> 3 Well screen interval for MW l MW 2 and <br /> -35 ---- MW-3 approximately 45 to 65 feet BGS <br /> i -------------- ------------------- <br /> -40 <br /> Sep-94 Aug-95 Oct-97 Jul-98 May-99 Jan-00 Oct 00 Jul-01 Apr-02 Jan-03 Nov-03 Jul-04 Apr-05 <br /> Time <br /> All MW Analytical 11-17 05 As <br />