Laserfiche WebLink
FIGURE 3 -HYDROGRAGH <br /> DATE(MONTH-YEAR) <br /> UD <br /> O coinQ � 9 QO OOQ_ Q <br /> _ <br /> CL U) U. Q Q O '? Q O O n Q a ' Q <br /> -10 <br /> -15 - - - - -- -- _ - -- - - - <br /> J <br /> N <br /> Z -20 - - - -- - - - -- - - - -- - - - - <br /> O <br /> Approximate elevation of top of well screen for <br /> Q monitor wells MW-4 through MW 7 Well <br /> screen interval for MWA through MW 7 <br /> Japproximately 40 to 60 feel BGS <br /> W -25 - -- - - - - - - - - - -- <br /> W <br /> H <br /> O <br /> Z -30 - - - - - -- - - - - - - <br /> {7 <br /> -35 <br /> Approximate elevatFon of tap of wait screen for <br /> monitor wells MW-1 MW 2 and MW-3 Welt <br /> screen interval for MW 1 MW 2 and MW 3 <br /> appmately 45 to 65 feet BGS <br /> -40 roxi <br /> BMW-1 —M MW-2 --BMW-3 MW-4 MW-5 —BMW-6 BMW-7 <br /> CANEPA'S CAR WASH <br /> PARK STREET <br /> PROJECT NO 2038 <br />