My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2900 - Site Mitigation Program
>
PR0542364
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 3:40:49 PM
Creation date
5/4/2020 3:01:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542364
PE
2960
FACILITY_ID
FA0024340
FACILITY_NAME
PACIFIC CAR WASH
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024014
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ENVIRONMENTAL HEALTHTEPARTMENT <br /> PppiN ��1., all®�QV�� t+Ovl� a 1 <br /> .0 Unit Supervisors <br /> e r ? Donna K.Heran,R.E.H.S. Carl Borgman,R.F.H.S. <br /> 304 East Weber Avenue, Third Floor <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> �9,: P • Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> GFOR Laurie A.Cotulla,R.E.H.S. Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> JERRY CACARO FILE COPY <br /> PACIFIC CAR WASH <br /> 4405 PACIFIC AVE <br /> STOCKTON CA 95207 <br /> WORK PLAN: "Work Plan Addendum — April 2003." FWD <br /> DATED: April 11, 2003 <br /> PREPARED BY: Tim Cuellar—Advanced GeoEnvironmental Inc. <br /> STATUS: APPROVED <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN (H&S <br /> 25299.37 subd(c)(3)l: <br /> • Install seven (7) 2"-multi-chambered, single cased monitoring wells <br /> on and offsite to define lateral and vertical extent of petroleum <br /> groundwater plume and, <br /> Analyze selected soil samples for TPI-Ig, BTEX, 1,2-DCA, EDB; Total <br /> Lead, MtBE and other Oxygenates and, <br /> • Submit a report of findings to EHD and, <br /> • Survey new wellheads and add new monitoring wells to existing <br /> quarterly monitoring and reporting schedule. <br /> COMMENTS AND CONDITIONS: <br /> Offsite City of Stockton Encroachment and Revocable permits and <br /> EHD well installation permit applications plus $89 fee per parcel are <br /> to be submitted to EHD. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN iH&S 25299.37, <br /> subd(c)(3)l: <br /> none <br /> DATED: May 7, 2003 BY: <br /> 56 t�9 <br /> Michael Infurna, Se i r REH20 4 8-3454 <br /> [X]Faxed to consultant on: 5'-7 0 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.