Laserfiche WebLink
i 10 June 1999 <br /> IIII AGE-NC Project No. 96-0229 <br /> Page 3 of 3 <br /> production of construction-grade asphalt. <br /> Soil Disposal at a licenced landfill: <br /> • Disposal of the impacted soil at BFI Landfill will involve costs for loading, transportation <br /> and disposal fees, without additional analytical laboratory analyses to characterize the soil . <br /> The work can proceed with minimal disruption to normal site activities. <br /> • The costs for transportation and off-site landfill disposal is estimated between $25 and $35 <br /> per ton. <br /> Based upon site conditions and estimated costs, AGE recommends the transportation and off-site <br /> disposal of the contaminated soil. <br /> If you have any questions or comments, please contact our office at (209) 4674006. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> Obert E. arty <br /> Senior Project Geologist/Directo Of Operations <br /> cc: Ms. Lila Billheimer - J. C. Shaugnessy Estate <br /> Advanced GcoEnvironmental, Inc. <br />