Laserfiche WebLink
DURING THE COURSE OF OUR SITE RECONSTRUCTION , WE REMOVED SOME <br /> CONCRETE AND REPLACED IT WITH NEW CONCRETE . WE HAD A DIFFICULT <br /> TIME REMOVING SOME OF THE HEAVY CLAY SOIL BELOW THE CONCRETE <br /> BECAUSE OF THE MOISTURE CONTENT IN THE SOIL . WITH SOIL BEING THIS <br /> HEAVY THE PERMEABILITY FACTOR WOULD BE EXTREMELY SLOW , ESPECIALLY <br /> TO DEPTHS DF FIFTEEN FEET AND MORE . <br /> IN CONCLUSION , I AGREE THAT YOUR REQUEST FOR FURTHER <br /> INVESTIGATION IS NECESSARY , HOWEVER AT THIS TIME I DO NOT HAVE <br /> THE FINANCIAL ABILITY TO UNDERTAKE THIS TASK . FOR HE TO DO ANY <br /> FURTHER TESTING , I WOULD HAVE TO ASK FOR A SIX MONTH EXTENSION . <br /> I HAVE MADE A BRIEF SYNOPSIS OF THIS SITE , AND IT IS MY FIRM <br /> BELIEF THAT ANY CONTAMINATION AT THIS LOCATION WAS DONE BY MR . <br /> SHAUGHNESSY OR HIS AGENTS AND THEIR NEGLECT . WITH THIS <br /> INFORMATION IT IS HIS RESPONSIBILITY FOR FURTHER TESTING AND <br /> CLEAN UP . MR . SHAUGHNESSY NEEDS TO BE KEPT ON AS A RESPONSIBLE <br /> PARTY FOR ANY CONTAMINATION . <br /> SINCEREL , <br /> j PETE GIAMBANCO <br /> i <br /> t <br />'s <br /> i <br /> a <br /> CC : LAURIE A COTULLA <br /> JEANNIE ZOLLEZZI <br /> E <br />'r <br /> I <br /> t <br />