Laserfiche WebLink
i <br /> 09 April 1999 <br /> AGE-NC Project No 96-0229 <br /> Page 5 of 5 <br /> 5.0. RECOMMENDATIONS <br /> Based upon data collected during January 1999, AGE recommends <br /> a Preparation of a Corrective Action Plan (CAP), the CAP should include results of any <br /> required feasibility studies to determine remediation alternatives for the site A receptor <br /> survey should also be performed to locate any receptors within 2,000 feet of the site, results <br /> of the receptor survey should be included in the CAP <br /> • Continued quarterly ground water monitoring and sampling should be performed at the site <br /> in April 1999 <br /> • Arrangements should be made to dispose of all stockpiled soil at the site by hauling off-site <br /> to a suitable hazardous waste facility (I e Forward Landfill) <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points (e g ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, Is made as to the professional <br /> recommendations contained in this report <br /> I <br /> Advancer!GeoEnvironmental,Inc <br />