Laserfiche WebLink
' Project Pacific Car Wash Project No AGE-NC-96-0229 BORING NO . <br /> Site Address 4405Pacific Avenue Total Depth 40 ft MW-7 <br /> Stockton, California Date 09 October 1998 <br /> Drilling Co Mitchell Drilling Logged by B Little Page 2 of 2 <br /> Drill Rig Type CME-75 Mobile Drill Rig Reviewed by N Henderson <br /> NQ <br /> 3 Lithologx Description <br /> INotes. <br /> Boring MW-7 terminated at 40 feet below surface grade <br /> – MW-7 completed as a ground water monitoring well utilizing <br /> 2-inch diameter PVC casing <br /> ASS-BUILT CONSTRUCTIONDET,9ILS. MW-7 <br /> Screen Interval 20 to 40 feet bsg <br /> 50— Blank Interval 0 5 to 20 feet bsg <br /> Sand Interval 18 to 40 feet bsg <br /> Bentonite Plug 16 to 18 feet bsg <br />' Grout Seal I to 16 feet bsg <br /> 60- <br /> 70-- <br /> I <br /> 80— <br /> i <br /> Advanced <br /> GeoEnvironmental, Inc. <br /> L WMJPRO%B REN -11PACCAR-110229MW7 SAM 01/07/99 @ 12 33 PM <br />