Laserfiche WebLink
' Project Pacific Car Wash Project No AGE-NC -0229 BORING NO <br /> Site Address 4405 Pacific Avenue Total Depth 400 P4 <br /> Stockton, California Date 30 July 1996 <br />' Drilling Co Enviro-Probe, Inc Logged by T Cuellar Page 1 of 1 <br /> Rig/Auger Type Geo-Probe 5400 Reviewed by N Henderson <br /> O� Lithologtc Description <br /> 4- <br /> SM <br /> 1 <br /> . . <br /> 10— <br />' P-4 @15' 00 - SAND, fine to medium-grained, silty,pale brown to dark brown, <br /> slightly damp, medium-dense, stiff <br /> 20— P-4 @20' 00 - SAND/SILT,fine-grained, dark brown, damp,firm <br /> fP-4 @ 25' 00 - . ' SAND,fine to medium-grained, silty, gray/green, moist, loose <br /> SM <br /> _ <br /> SW o <br /> 0 <br /> 30—P-4 @ 30' 100 - o SAND,fine to coarse-grained, moist, loose, green/gray, <br /> – o <br /> o <br /> - : .... <br /> o <br /> _-4 u 35 7 e gra;'el <br /> I – SW <br /> ML <br /> 40—IP-4 @ 40-1 10 - ML SILT, sandy,fine-grained, dark brown,very moist, firm to stiff <br /> Bottom of boring equal to 40 feet bsg Ground water encountered at <br /> 37 reel 1.. Bonn baclled with Portland T e li cement <br /> Advanced <br /> GeoEnvironmental, Inc. <br /> L 1AMIPROIDOG510229P4 SAM 01/30/87 Q 0 54 AM <br />