Laserfiche WebLink
TABLE 8 <br /> OPERATIONAL UPTIME AND FLOW RATE <br /> FOR SOIL VAPOR EXTRACTION SYSTEM -UNIT 2 (SL NO : 9321) <br /> ARCO Facility No 6100 <br /> 25775 South Patterson Pass Road <br /> Tracy, Califorrnia <br /> Date Hr Meter Flow Rate Vacuum Influent Days Between Sam lm Cumulative Das Percent <br /> Reading scfm "WC IPID(Rpmv)lTotal Das U time I Total Das Uptime Uptime <br /> 03/09/04 NM 193 07 10 330 System start-up, collect samples and shutdown awaiting <br /> analytical results <br /> 03/15/04 NM 19973 10 180 System start-up upon SJVAI'CD approyal <br /> 03/23/04 NM 19640 12 230 8 -- 6 -- -- <br /> 03/29/04 NM 40 10 262 6 -- 12 -- -- <br /> "WC-Inches water column <br /> scfm-Standard cubic feet per minute measured using standard calibrated guages <br /> M -Not measured <br /> ARCO-6 100 O&M Page 1 of 1 5TRATU5 <br />