My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011832
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011832
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:36:42 AM
Creation date
5/5/2020 8:30:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011832
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> . Soil sampling equipment will be cleaned with a detergent water solution, rinsed with <br /> clean water, and equipped with clean liners between sampling intervals Augers and <br /> samplers will be steam cleaned between each boring to reduce the possibility of cross <br /> contamination Steam cleaning effluent will be contained in 55-gallon drums and <br /> temporarily stored on site The disposal of the effluent will be the responsibility of the <br /> client <br /> Drill cuttings generated during the drilling procedure will be stockpiled on site <br /> Stockpiled drill cuttings will be placed on and covered with plastic sheeting The <br /> stockpiled soil is typically characterized by collecting and analyzing composite samples <br /> from the stockpile Delta Environmental will recommend an appropriate method for <br /> disposition of the cuttings based on the analytical results The client will be responsible <br /> for disposal of the drill cuttings <br /> Soil Sample Collection <br /> During drilling, soil samples will be collected in cleaned brass, two by six inch tubes <br /> The tubes will be set in an 18-inch-long split-barrel sampler The sampler will be <br /> conveyed to bottom of the borehole attached to a wire-line hammer device on the drill <br /> rig When possible, the split-barrel sampler will be driven its entire length, either <br /> hydraulically or by repeated pounding a 140-pound hammer using a 30-inch drop The <br /> number of drops (blows) used to drive the sampler will be recorded on the boring log <br /> • The sampler will be extracted from the borehole, and the tubes containing the soil <br /> samples will be removed Upon removal, the ends of the lowermost tube will be sealed <br /> with Teflon sheets and plastic caps Soil samples for chemical analysis will be labeled, <br /> placed on ice, and delivered to a state-certified analytical laboratory, along with the <br /> appropriate chain-of-custody documentation <br /> Soil Classification <br /> As the samples are obtained in the field, they will be classified by the field geologist in <br /> accordance with the Unified Soil Classification System Representative portions of the <br /> samples will be retained for further examination and for verification of the field <br /> classification Logs of the borings indicating the depth and identification of the various <br /> strata and pertinent information regarding the method of maintaining and advancing the <br /> borehole will be prepared <br /> Soil Sample Screening <br /> Soil samples selected for chemical analysis will be determined from a head-space <br /> analysis using a PID or an FID The soil will be placed in a Ziploc® bag, sealed, and <br /> allowed to reach ambient temperature, at which time the PID probe will be inserted into <br /> the Ziploco bag The total volatile hydrocarbons present are detected by the PID and <br /> reported in parts per million by volume (ppmv) The PID will be calibrated to an <br /> isobutylene standard <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.