My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011833
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:15:40 AM
Creation date
5/5/2020 8:32:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011833
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date February 28, 2002 <br /> ARCO QUARTERLY STATUS REPORT <br /> Facility No 6100 Address 25775 Patterson Pass Road, Tracy, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person Delta Environmental Consultants, Inc /Jay R Johnson <br /> Consultant Project No D000-340-1 <br /> Primary Agency/Regulatory ID No Margret Lagono, San Joaquin County Public Health Serivices <br /> BRIEF HISTORY <br /> Four gasoline UST's, one waste oil UST, and associated product piping were removed in 1987 Between <br /> 1991 and 1995 a total of 31 soil borings were drilled to depths between 26 and 115 feet below ground <br /> surface (bgs) Twenty vapor extraction wells (VW-1 through VW-20) were installed in selected borings <br /> Pinnacle Environmental Solutions, Inc submitted a request for "No Further Action" to the RWQCB on <br /> February 1, 2000 The RWQCB denied the request, and requested a groundwater investigation <br /> One soil boring (13-32) was drilled at the site to a depth of approximately 200 feet bgs in August 2000 <br /> Groundwater monitoring well MW-1 was installed in this boring to a depth of approximately 115 feet bgs <br /> Following construction of the well, free product was observed in the well Floating product has been 1 <br /> removed manually from the well on a weekly basis since September 2000 <br /> Following a meeting between the RWQCB, San Joaquin County PHSIEHD, and ARCO on January 10, <br /> 2001, Delta submitted a work plan for additional assessment of subsurface conditions beneath the subject <br /> site Delta retained Western Strata Exploration of West Sacramento to complete the work activities in <br /> August and September, 2001 <br /> WORK PERFORMED THIS QUARTER (Fourth, 2001) <br /> 1 Delta visaed the site weekly to remove floating product from well MW-1 <br /> 2 Delta monitored select vapor extraction and monitoring wells for the presence of water and free <br /> product Wells MW-2, VW-5, and VW-6 were sampled on November 6, 2001 <br /> 3 Delta sampled the onsite water supply well on November 12, 2001 <br /> WORK PROPOSED FOR NEXT QUARTER (First, 2002) <br /> 1 Delta will continue to remove floating product from well MW-1 on a weekly basis, monitor free <br /> product thickness in selected wells, and remove floating product when necessary <br /> 2 Delta will continue to monitor depth-to-water in selected vapor extraction and monitoring wells <br /> P 1ARCO161001QTRLY120011Arco_6100_4Q01 doc Delta <br />
The URL can be used to link to this page
Your browser does not support the video tag.