My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011839
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:16:52 AM
Creation date
5/5/2020 8:34:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011839
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� y <br /> Date Ma 17, 1996 <br /> ARCO QUARTERLY STATUS REPORT <br /> Facility No 6100 Address 25775 South Patterson Pass Road, Tracy, California <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person EMCON/Ja R Johnson <br /> Consultant Protect No 20805-152 004 <br /> Primary Agency/Regulatory ID No Margaret La ono, San Joaquin C ouny Public Health Services <br /> WORKED PERFORMED THIS QUARTER (First- 1996) <br /> No environmental work was conducted at the site during this quarter <br /> WORKED PROPOSED FOR NEXT QUARTER (Second- 1996)• <br /> EMCON will finalize the Problem Assessment Report summarizing information collected during all <br /> assessment and feasibility activities conducted at the site and will present the findings and <br /> interpretations The report will include historical data tables, present the distribution of hydrocarbons in <br /> soil, and outline remedial alternatives <br /> Current Phase of Project Remediation <br /> ATTACHMENTS. <br /> • Figure 1 Site Location Map <br /> • Figure 2 Generalized Site Plan <br /> cc Elizabeth Thayer, RWQCB <br /> SAC1NN\PJ"80W805 1520 4AS-95\cjb 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.