My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011936
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011936
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:26:42 AM
Creation date
5/5/2020 8:38:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011936
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 9 <br /> OPERATIONAL UPTIME AND FLOW RATE <br /> FOR SOIL VAPOR EXTRACTION SYSTEM- UNIT 2 (SL NO. 9230) <br /> ARCO Facility No 5100 <br /> 25775 South Patterson Pass Road <br /> Tracy, California <br /> Date Hr Meter Flow Rate Vacuum 1. Influent Days Between Sampling Cumulative Das Percent <br /> Readm (scfrn) ("WC) PID ( mv) Total Days U time Total Das U time U time <br /> "WC- Inches water column <br /> I <br /> scfrn - Standard cubic feet per minute measui ed using standard calibrated guages <br /> NM -Not measured <br /> System observed non-operational System re-started by iesettmg power <br /> System observed shutdown due to high temperature System re-started after making temperature control adjustments <br /> Includes dilution air flow rate <br /> Shutdown system pending blower replacement <br /> 5 Shutdown system pending receipt and review of analytical results for 10/14/04 samples <br /> System restarted and shutdown after collecting air samples to verify destruction efficiency <br /> Shutdown system pending blower replacement <br /> i <br /> i <br /> ARCO-6 I 00o a M Page 2 of 2 STRATUS <br />
The URL can be used to link to this page
Your browser does not support the video tag.