								       • 	WORK PERFORMED THIS QUARTER(Fourth 2005)
<br />  		1      Stratus monitored all vapor extraction and monitoring wells for the presence of water and free
<br />  			product on December 19, 2005   Groundwater samples were collected from wells MW-2, MW-4,
<br />  			MW-8, MW-10, MW-12, MW-13, VW-3, VW-5, VW-6, and the domestic well  Well MW-15 had free
<br />  			product and was not sampled   Wells MW-1, VW-1, and VW-4 had a product sheen and were not
<br />  			sampled
<br />  		2      Stratus conducted six site visits to conduct routine operation and maintenance, and to collect the
<br />  			required discharge compliance air samples from the SVE system   Free product, if measured, was
<br />  			also manually bailed during these site visits
<br />  		3      Stratus bailed approximately 2 gallons of product/water mixture from MW-1, approximately 2 gallons
<br />  			from well MW-4, approximately 8 gallons from well MW-15, approximately 2 gallons from well
<br />  			VW-1, and approximately 2 gallons from well VW-4
<br />  		4      Stratus compiled and evaluated the monitoring and sampling data
<br />  		5      Between December 12 and December 16, 2005, Stratus installed off-site groundwater monitoring
<br />  			wells MW-16 through MW-20   These wells will be included in the regularly scheduled monitoring
<br />  			and sampling events beginning first quarter 2006
<br />  		WORK PROPOSED FOR NEXT QUARTER(First 2006)
<br />  		1      Monitoring for the presence of free product in wells MW-1, MW-4, MW-15, VW-1, and VW-4 will be
<br />  			conducted periodically, and if present, bail floating product
<br />   S2      Water levels will be measured and samples will be collected from wells MW-2, MW-4, MW-8,
<br />  			MW-10, MW-12, MW-13, MW-15 through MW-20, VW-1, and VW-4   A sample will be collected
<br />  			from the water supply well
<br />  		3      The next sampling event is tentatively scheduled for March 2006   Groundwater samples will be
<br /> 			analyzed for gasoline range organics (GRO), benzene, toluene, ethylbenzene, total xylenes (BTEX),
<br /> 			tertiary butyl alcohol (TBA),  methyl tertiary butyl ether (MTBE), di-isopropyl ether (DIPE), ethyl
<br /> 			tertiary  butyl  ether (ETRE),  tertiary amyl  methyl  ether (TAME),  1,2-dichloroethane (1,2-DCA),
<br />  			1,2-dibromoethane (EDB), and ethanol using USEPA Method 82606
<br /> 		4      Bi-monthly site visits will be conducted to monitor system performance, maintain equipment, and to
<br /> 			collect compliance samples from the SVE system
<br />  		5      A document of the well installation activities will be submitted to SJCEHD
<br />   					Current Phase of Project       Monitoring/Remediation
<br />     			Frequency of Groundwater Sampling       All Monitoring Wells =Quarterly
<br />   			Frequency of Groundwater Monitoring       Quarterly
<br />       						Sampling Date       December 19, 2005
<br />     			Is Free Product(FP) Present on Site       Yes (FP MW-15, and sheen MW-1, MW-4,VW-1, and VW-4)
<br />       				FP Recovered This Quarter       16 gallons
<br />       			Cumulative FP Recovered to Date       272 gallons
<br />   •   			Depth to Groundwater(Upper)       39 45 to 66 74 feet below ground surface(bgs)
<br /> 		K 1Bp-Arco for URS161001Quarterly120051Arco_6100 4Q05 doc							57RATU5