My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011939
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:22:41 AM
Creation date
5/5/2020 8:41:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011939
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3330 Cameron Park Drive Ste 550 <br /> Cameron Park California 95682 <br /> (530)676-6004--Fax (530) 671-6005 <br /> June 27, 2006 <br /> o <br /> coo <br /> Mr Rusty Benkosky <br /> SECOR International, Inc <br /> 3017 Kilgore Road, Suite 100 <br /> Rancho Cordova, California 95670 <br /> Re Groundwater Sampling Data Package, ARCO Service Station No 6100, located at <br /> 25775 S Patterson Pass, Tracy, California (Quarterly monitoring sampled on June 26, <br /> 2006) <br /> General Information <br /> Data Submittal Prepared/Reviewed by Tammy Arkus / Steve Carter <br /> Phone Number (530) 676-6008 <br /> On-Site Supplier Representative Chris Hill <br /> Arrival 02 00 Departure 11 00 <br /> Weather Conditions Clear <br /> Unusual Field Conditions None <br /> Scope of Work Performed Quarterly monitoring and sampling <br /> Variations from Work Scope As listed below <br /> 1 Wells MW-3, MW-5 through MW-9, MW-14, MW-19, MW-20, VW-2, VW-7 through <br /> VW-14, and VW-16 through VW-20 were dry <br /> 2 The field southwest of the site (across Patterson Pass Road) has been plowed Well <br /> MW-12 could not be located by field personnel <br /> 3 Free product was measured in well MW-15 A product sheen was observed in wells <br /> VW-1 and VW-4 after approximately 10 gallons had been purged These wells were not <br /> sampled <br /> 4 Wells MW-1, MW-2, MW-4, MW-13, VW-3, VW-5, and VW-6 purged dry <br /> This submittal presents the tabulation of data collected in association with routine groundwater <br /> monitoring The attachments include sampling procedures, field data collected, and chain of <br /> custody documentation The information is being provided to BP-ARCO's Scoping Supplier for <br /> use in preparing a report for regulatory submittal This submittal is limited to presentation of <br /> collected data and does not include data interpretation or conclusions or recommendations Any <br /> questions concerning this submittal should be addressed to the Preparer/R.eviewer identified <br /> above <br /> SUN 2 s 2006 <br /> K\Bp-Arco for URS\6100\Quarterly\2006\Arco_6100_2Q06 QM data pkg doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.