Laserfiche WebLink
TABLE 9 <br /> OPERATIONAL UPTIME A.ND FLOW RATE <br /> FOR SOIL VAPOR EXTRACTION SYSTEM- UNIT 2 (SL NO 9230) <br /> ARCO Facility No 6100 <br /> 25775 South Patterson Pass Road <br /> Tracy, California <br /> Date Hr Meter Flaw Rate Vacuum Influent Dais Between Sam hna Cumulative Days Percent <br /> Readtns (scfm) I ("WC) I PID( mv)I Total Days I U t— I Total Days I Uptime Uptime <br /> "WC-Inches water column <br /> scfm-Standard cubic feet per mmute measured using standard calibrated guages <br /> NM-Not measured <br /> System observed non-operational System re-started by resettmg power <br /> System observed shutdown due to high temperature System re-started after making temperature control adjustments <br /> Includes dilution air flow rate <br /> Shutdown system pending blower replacement <br /> Shutdown system pending receipt and review of analytical results for 10/14/04 samples <br /> System restarted and shutdown after collecting air samples to verify destruction efficiency <br /> Shutdown system pending blower replacement <br /> wxco_esoo_o&M Page 2 of 2 srIZArUs <br />