My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2900 - Site Mitigation Program
>
PR0543479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:58:34 AM
Creation date
5/5/2020 9:11:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543479
PE
2960
FACILITY_ID
FA0024679
FACILITY_NAME
CANEPA'S CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
081360030
CURRENT_STATUS
01
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
613
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C JUS 2 6 200 , <br /> E 'i' ENVIF�I� <br /> PRMITj,SE � 'V1CF_ g T H <br /> CONDOR EARTH TECHNOLOGIES INC. <br /> 1125 N . Golden State Blvd. 188 Frank West Circle <br /> July 25, 2001 Suite G Suite I <br /> Turlock, CA 95381 Stockton , CA 95206 <br /> (209) 668-9234 (209) 234-0518 <br /> FAX (209) 668-9248 FAX (209) 234-0538 <br /> Jeffrey C. F. Wong <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> Re: Canepa's Car Wash, 6230 Pacific Avenue, Stockton, CA <br /> Site Code: 1225, Condor Project No. 1707 <br /> Dear Mr. Wong: <br /> Condor Earth Technologies, Inc. (Condor) received pre-approval from the UST fund for the <br /> additional soil and groundwater investigation in a letter dated July 18, 2001 . We scheduled the <br /> Cone Penetrometer (CPT) for the fust available period, starting September 24, 2001 . We expect <br /> to complete the CPT work within one week (including the proposed soil borings) . We scheduled <br /> a two-week delay after the CPT work to install the proposed wells in case we find anything in the <br /> CPT samples that may affect the well locations or depth. The wells are scheduled for installation <br /> the week of October 15, 2001 , <br /> Sincerely, <br /> 7'ecManiager <br /> TECHNOLOGIES, INC. <br /> 2� <br /> cc: Mr. Remo Canepa, Canepa's Car Wash <br /> \\Pdc\pmjects\1707 Canepa-Pacific\Correspondence\7 25-01 J-Wong,doc <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br /> hftp://www.condorearth.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.