Laserfiche WebLink
FIGURE 3 - HYDROGRAPH <br /> co M M Go m 0 O) C) <br /> 01 O 61 01 Q� 41 Q7 0 6) � � Ch O C� O <br /> m m m t3 m a �`a m $ ro 4 m 9 <br /> -15.0 <br /> -20.0 Approximate elevation of top of screen ....... ___ --------- _ _--_---.. . <br /> for monitor mills MW-6 through MW-8. <br /> Well screen interval for MW-6 through <br /> MW-8 is approximately 45 to 65 feel <br /> J bgs. <br /> H <br /> 25A <br /> O <br />� a <br /> J <br /> W -30.0 <br /> s!>r44 <br /> W <br /> a <br /> 3 <br /> a <br /> i z <br /> O= -35.0 ..— ----------- - ------ ------- --- -------___ - -----------.._--_ __----- ----- _- - -------------- <br /> EJC Approximate elevation of top of screen for <br /> O monitor wells MW-1 through MW-5. Well <br /> screen interval for MW-1 through MW-5 is <br /> approximately 50 to 70 feet bgs, <br /> -40.0 - - --- - _._. - -- --------.._.. ---- _-----..._..--- --- --._.-..-.._-_ ---...__ -------------- <br /> --0-MW-1 -4 MW-2 MW-3 -iF-MW-4 mwM 5 --*--MW-6 <br /> -+--MW-7 —MW-8 MW-9 MW-110 MW-11 MW-12d <br /> X5.0 DATE(MONTH-YEAR) <br /> CANEPA'S CAR WASH <br /> PACIFIC AVENUE <br /> PROJECT NO. 1707 <br />