Laserfiche WebLink
' 11III 1,Mill suit Old(Gnuunl«qcr JMCMI =wm <br /> ( ox1i t.( v 1%e Mi <br />' 4,120 1'iotti.SI ',ioL klon (A <br /> J gnu tin 21 19114 <br /> P t�,c 2 <br />' <br /> 31 SITE PREPARATION <br /> Prior to the fieldwork drilling pt rinits N%ill be obtained from the San ioadunl County PIIS/EVID The <br /> proposed boring locations will be marled with x%hae paint and Underground Service Alert (USA) will be <br /> notified at least 72 hours in advance of the fieldNkork However because the proposed boring locations <br />' are on private property utilities contacted by USA -,%ill not marl. their I111eS past propertN lines and into <br /> the site 1-heicfore it is the responsibiht� of Canepa s Car Wash to locate and idLntifj underground <br /> utilItics in and near the work area I'he 1111ti/l:l ID will be notified of the fieldwork schcclulc at least 72 <br /> hours in advance <br /> 3 2 DRILLING PROCEDURES <br />' The fieldwork will include the installation of two borings at the proposed locations shown in Figure 2, <br /> Appendix A The boreholes will be drilled by Spectrum Exploration Inc (License #512268) under the <br /> supervision of a Condor geologist Prior to commencement of wort, each day a tailgate safet} meeting <br /> will be held and a site-specific Health and Safety Plan will be discussed with and presented to all creNN <br />' members for their signatures A copy of the Health and Safety Plan is contained 111 Appendix Q <br /> Both of the bormos %\ill be drilled using 6-inch O D continuous-flight hollow-stern auger The auger <br /> will be steam cleaned before each borehole is drilled The borings will be dulled to approximately 70 <br />' feet bgs for the purpose of collecting vadose zone soil samples and sirnlultaneous and discrete Soil and <br /> groundwater samples in the saturated zone with the Simulprobe sampling dei ice I he water table is <br /> appromi nately 40 feet beloN\ the ground surface <br /> Upon completion of the drilling and sampling the boreholes \%ill be grouted NNith a cement slurry <br /> containing 3 to 5 percent bentonite The slum Ni ill be tremied into the borehole to avoid bridging All <br /> decontamination ansate produced during the field work %%ill be placed in a 55-gallon drum sealed <br /> labeled and left on site pending laboratory anal\ses Disposal of hazardous materials ifan-, %\ill be the <br /> respofimbilitN of Canepa s Car Wash <br /> 33 SOIL SAMPLING <br /> Soil tramples \ill be collected using a five foot long split-spoon sampler fitted .+itli acetate liners The <br /> soil S,Illlplin Lquipment will be cleaned prior to collecting LAL11 sample rhe Ocaning procedures \%ill <br /> consist of washing the samplci in a Solution of laboratory- raclL 11(,11-ph0sphate dctLF(,cnt and <br /> hydrocarbon-lre(. eater and double-rinsing \%ith contaminant-free %\atcr <br /> During the s impling the split-spoon will he driven ahe:d of the -uper S011 sn'npies tie-in he collected for <br /> laboratory analysis at five foot inter\als, or at significant hthologic changes in the vadose Lone <br /> Discrete soil Samples will be collected for analysis by cutting a six inch long segment from the desired <br /> portion of the soil filled acetate liner A portion of the liner contents \vill be used for geological logging <br /> 1 and organic vapor analyzer-photoionization detector(OVA-PID) measurements The sample selected for <br /> analysis will be prepared as described below for shipment to the laboratory The samples will be <br /> iogged WlLording to the Unified Soil Ciassification System Driiiing, iogs \viii De preparea ana viii <br /> includ[, f ic.ld obsen ations such as estimated moisture t,ontent color and odor <br /> Selected soil samples collected from each borehole will be sent to the laboratory for chemical analvsis <br /> based on field observations and OVA-PID measurernents At least five soil simples from the. vadose <br /> zone of each boring \sill be anaNzed Each sample %ill be retained undi4sturbed in the: acetate; hirer <br /> sealt,d it the ends �\ith Z efloln tape capped wrapped with duct tape. and labc,lcd 111L samples will be <br /> stored in a cooler chilled with Blue Ice and dcliverLd within 24 hours of coliec 1011 under chain-oi- <br /> uistocl,, procc,dures to CGeoAnalytieal Laboratories, in Modesto Cahlornia 0 California State Certified <br /> �� CONDOR <br />