Laserfiche WebLink
1/812020 https://adhoc-wcprod.accela.com/AdhocReportWeb/Report/AdapterToReportViewer.aspx?rn=Buildingllnspection History&p1value=BP19-0... <br /> Update Results <br /> r <br /> =5CITY OF <br /> 1STOCKTON <br /> INSPECTION HISTORY <br /> RECORD #: BP19-08003 <br /> ADDRESS: 4704 FITE CT ' <br /> APN: 18111013 <br /> RECORD TYPE:Commercial <br /> DESCRIPTION:Removal of two old oil tanks,place and anchor of one new oil tank. <br /> i -,i E;"C TON TYPE' S'H::1 U;-_E) 0A&f- �'#'�SPEC i z:a�K i t_- '"v�U LT C 0 M M E K, `s INSPECTOR_S a_x,11,S <br /> 022 Final Building 1/8/2020 1/8/2020 Per Rick Gunn, received Cesar Lopez Approved <br /> letter from special inspection <br /> agency. Ok to final and <br /> approve. CL- 1/8/2020 <br /> 021 Final Fire 12/23/2019 12/23/2019 12-23-2019 onsite contact Bill Costanza Approved <br /> Bob Martin,209-810-6730. <br /> Inspection of 650 gal tank of <br /> new motor oil. Double wall <br /> tank provides secondary <br /> containment as designed. <br /> Corrections needed: 1. Place <br /> NFPA placard for new oil on <br /> tank. completed while on <br /> scene. 2. Place no smoking <br /> signs on both waste oil and <br /> new oil containers"no <br /> smoking -within 25 feet'. <br /> Email picture to inspector <br /> once signage is placed on <br /> tanks. Full fire clearance <br /> granted with Building Dept <br /> approval. <br /> 003 Foundation 12/18/2019 12/18/2019 Requires fire final for Richard Gunn Approved <br /> complete final <br /> :019 Special Inspection 12/18/2019 12/18/2019 Daily approved provide final Richard Gunn Disapproved <br /> letter from special <br /> inspections <br /> https://adhoe-wcprod.accela.com/AdhocReportWeb/Report/AdapterToReportViewer.aspx?rn=Buildingllnspection History&plvalue=BP19-08003&output= 1/1 <br />