My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 4:20:49 PM
Creation date
5/5/2020 10:23:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fpnRRT n-SPat MR` <br /> SPCC PLAN FIVE-YEAR REVIEW CERTIFICATION <br /> In accordance with 40 CFR§112.5(b),a review and evaluation of this Spill Prevention, <br /> Control,and Countermeasure (SPCC)Plan is conducted at least once every five years. <br /> As a result of this review and evaluation,The Martin-Brower Company,L.L.C.will <br /> amend the SPCC Plan within six months of the review to include more effective <br /> prevention and control technology if: (1) such technology will significantly reduce the <br /> likelihood of a spill event from the facility,and(2) such technology has been held, <br /> proven at the time of review. Any amendments required as a result of this review <br /> will be documented. Any amendments to the SPCC Plan shall be implemented as <br /> soon as possible but not later than six months following preparation of any <br /> amendments,and any technical amendment will be certified by a professional <br /> engineer. Refer to Appendix B for the five-year SPCC Plan Review Statement. <br /> Review Dates Signature <br /> May 2020(Technical Amendments <br /> August 2021 <br /> August 2026 <br /> August 2031 <br /> viii ■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.