My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 4:20:49 PM
Creation date
5/5/2020 10:23:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ITAI4RTJ77-15C�CaGiLAE1�" <br /> ak a-MR <br /> Subpart A-Applicability,Definitions and General Requirements for All Facilities and All <br /> Types of Oils <br /> Section 112.1 General Applicability <br /> Because the aggregate aboveground petroleum oil storage capacity at Martin- <br /> Brower's Stockton Distribution Facility (Facility) is greater than 1,320 gallons,a <br /> Spill Prevention, Control, and Countermeasure (SPCC) Plan is required <br /> for this facility. <br /> There are no underground bulk storage tanks or completely buried storage tanks <br /> at the Facility. There is an Oil/Water Separator associated with the truck wash <br /> that is underground. This equipment is exempt from Plan requirements except <br /> for unloading operations. <br /> Section 112.3 Requirement to Prepare and Implement a Spill Prevention, Control, and <br /> Countermeasure Plan <br /> The Facility was not in operation prior to 16 August 2002. The Facility has <br /> implemented the changes required in this Plan. <br /> A licensed Professional Engineer has reviewed and certified this Plan. <br /> Refer to Page (vii)for the"Professional Engineer's Certification." <br /> The Martin-Brower Company,L.L.C. maintains a complete copy of the SPCC <br /> Plan at the facility in the following offices and is available to the Regional <br /> Administrator for on-site review during normal working hours: <br /> • Distribution Process Manager (Casey Hays),and <br /> • Electronically (Y Drive) Shared Drive <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.