My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 4:20:49 PM
Creation date
5/5/2020 10:23:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�177CI4N�TJ77- CLAEI�" <br /> F km C.-MR <br /> The Martin-Brower Company,L.L.C.will complete a review and evaluation of <br /> the SPCC Plan at least once every five years and will amend the SPCC Plan <br /> within six months of the review,if an amendment is required. Amendments will <br /> be implemented as soon as possible,but not later than six months following <br /> preparation of any amendment. Refer to Page (vii) and Appendix B of this Plan <br /> for the Five-Year Review Certification and Review Statement. <br /> A Professional Engineer will certify all SPCC Plan technical amendments. <br /> All Plan amendments are documented on Page (x),"SPCC Plan History." <br /> Section 112.6 Qualified Facility Plan Requirements <br /> The Facility is not a Qualified Facility as described in§112.3(g) based upon the <br /> following: <br /> • Tier I criteria§112.3(8)(1): The facility has 2 diesel fuel storage tanks that are <br /> 10,000 gallons each. <br /> • Tier II criteria§112.3(g)(2): The facility has not had a single discharge <br /> exceeding 1,000 gallons or 2 discharges each exceeding 42 gallons within any <br /> 12-month period in the three years prior to the SPCC Plan date. <br /> (i) The facility has an aggregate aboveground oil storage capacity of <br /> approximately 25,148 gallons. <br /> (ii) The facility is not an onshore oil production facility. <br /> SECTION 112.7 GENERAL REQUIREMENTS FOR SPILL PREVENTION, CONTROL, <br /> AND COUNTERMEASURE PLANS <br /> The Facility SPCC Plan has been prepared in accordance with good engineering <br /> practices and has the full approval of management at a level of authority to <br /> commit the necessary resources to fully implement the Plan. Refer to Page (ix) <br /> for management approval. The Plan follows the sequence as specified in§112.7. <br /> SECTION 112.7(A)(2) GENERAL REQUIREMENTS <br /> The Facility SPCC Plan does not deviate from the security(§112.7(g)),facility <br /> tank car and tank truck loading/unloading(§112.7(h)(2) and (3)),and brittle <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.