Laserfiche WebLink
Emergency Coordinators have been supplied with appropriate communication devices to alert them in the <br /> occurrence of an emergency(at least on one of the following): Nextel cellular phone systen-L The primary <br /> Emergency Coordinator will be contacted first;if he is not available,the alternate Emergency Coordinators <br /> should be called in the order listed. <br /> The Emergency Coordinators have been selected based on their familiarity with the Heinz Stockton Factory, <br /> the Emergency Response Contingency Plan,operation and activities at the facility,the location and <br /> characteristics of the wastes handled,the location of the records within the facility,and the facility layout. <br /> The Emergency Coordinators have complete authority to commit all resources of the company to carry out <br /> the Emergency Response Contingency Plan in the event of an emergency. Exhibit 3"Emergency Telephone <br /> List"provides organizations(police,fire,etc.)that may be contacted by the Emergency Coordinator in the <br /> event of an emergency. <br /> Identification of Hazardous Materials <br /> Any emergency involving the container storage area or tanks 1 and 2 will be an emergency involving <br /> hazardous waste. The material being stored here is ignitable,corrosive,toxic characteristic and listed. <br /> Exhibit 1 provides a detailed list of all hazardous wastes generated at the Heinz Stockton Factory. In the <br /> event of a fire/explosion and/or spill,the source will be identified visually to determine: <br /> • The character of the release material; <br /> • The exact source of the released material;and <br /> • The amount of released material. <br /> If needed,references to facility records and reports from employees will also be made. <br /> Once the material is identified,control measures are implemented. <br /> Control Procedures <br /> This Emergency Response Contingency Plan will be implemented in the event of a spill of hazardous waste, <br /> fire,any explosion,or a combination of these. Additionally,the Contingency Plan will be implemented if <br /> the Emergency Coordinator determines that a threat to human health or the environment exists. <br /> Implementation of this Emergency Response Contingency Plan is intended to mitigate or protect facility and <br /> neighboring personnel from injury;contamination of storm sewers with hazardous waste materials;damage <br /> to equipment;damage to the environment;or a combination of these. <br /> This section of the Emergency Response Contingency Plan addresses control procedures relative to <br /> hazardous waste emergency episodes from 250 Gallon storage tank in Fire Pump House: <br /> Control Procedures: Fire/Explosion(Tanks or Containers) <br /> The following actions will be taken in the tank accumulation area or container accumulation area affected by <br /> fire or explosion <br />