My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:44:53 AM
Creation date
5/5/2020 10:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 30, 2005 <br /> Page 2 <br /> • Photos of the damaged soil vapor probes will be provided <br /> • Installation locations of soil vapor probes SG-3,SG-6,SG-10 and SG-13 will be reviewed/verified <br /> • Technical justification for locations including known impacted source areas(e.g.MIP-15 and others)and <br /> depths of proposed soil vapor probes including proposed construction installation and completion details <br /> • Technical justification for the collection of additional data to assist in the evaluation and selection of a <br /> remedial option to expedite site cleanup(a list of potential remedial alternatives being considered for pilot <br /> testing at the site will be included) <br /> dw�:w <br /> We appreciate the EHD's continued understanding and patience regarding gr <br /> the proess aYthese sites,Chevron <br /> shares the EHD's desire to move these sites towards closure. All currently approved work plans(i.e. the destruction <br /> of NP-1 and redevelopment of U-17)will be completed during November 2008J."4Following the approval of the <br /> amended work plans for these sites they will be moved forward without addit.,ional'`delay., <br /> If you have any questions or comments regarding the contents of this etter,please contact;meat(925)543-2349 or <br /> by e-mail at sfur al(cr)chev.ron.coni: <br /> 4y <br /> Stephanie A.Furgal <br /> Project Manager �F <br /> yr <br /> J <br /> eV. <br />
The URL can be used to link to this page
Your browser does not support the video tag.