Laserfiche WebLink
ET TL ER - YA . lINC, <br /> � . <br /> M DAILY SAMPLING REPORT <br /> e Location: .lob I _ L g�=o S-r4 - <br /> __._._ - <br /> �. Date: e.45-1w_ _e /6,/ a <br /> :SCRIPTION OF WORK PERFORMED: CHECK LIST: <br /> Monitor ,f Transfer Purge Water To: <br /> Purge Drums on site: <br /> Sample ,,/ Holding tank_ ✓ _ <br /> Devefop Total Purge Wct?r(caisl: <br /> otal = of Wells @ site: a SampCng Truck: <br /> Water levels only: Purge water trailer: <br /> *AonitoredlSampled: 2 /-5 Trak Control: <br /> Sailed Product: Arrow board/road signs/canes <br /> 'URGING EQUIPMENT: SAMPLING EQUIPMENT: <br /> Disposal bailer Teflon bauer <br /> Teflon baiter Disposable bailer, <br /> 318" slack pumps ,/ Grab sample <br /> 1 - double diaphram --- - -- Pressure bailer <br /> Grundfo's <br /> OTHER EQUIPMENT: SPECIAL EQUIPMENT: <br /> Gloves �g1 �. Turbidity Meter <br /> Bailer card /tjp t D O Meter <br /> Well plug size Re-Dox Neter <br /> Po 4, Alkalinity test <br /> of MMENTS: <br /> Sampled by: <br /> Assistant: lime Billed: 2Z. s"` <br />