My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012309
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:19:09 PM
Creation date
5/5/2020 12:02:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012309
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r" <br /> r✓ <br /> Quarterly Summary Report <br /> • First Quarter 2000 <br /> Former Unocal Service Station 2859 <br /> 1665 Pacific Avenue <br /> Stockton, California <br /> County STID # None <br /> County San Joaquin <br /> BACKGROUND <br /> Underground storage tanks removed in March 1988 From March 1988 through <br /> November 1994, a total of 12 on-site and 3 off-site borings were drilled Four on-site <br /> monitoring wells, 3 on-site soil vapor extraction (SVE) wells, and 5 off-site monitoring <br /> wells were installed Analytical results indicate that soil near the eastern dispenser island <br /> contains gasoline hydrocarbons and groundwater has been impacted with gasoline <br /> hydrocarbons A work plan to initiate a SVE pilot test was submitted on July 14, 1995 <br /> A 30-day public notification for air permitting was initiated, and an air permit to <br /> construct was received in December 1995 The SVE remedial system was constructed in <br /> January 1996 The SVE pilot test was run from January through November 1996, during <br /> which time it removed nearly 2,800 pounds of hydrocarbons <br /> . RECENT QUARTER ACTIVITIES <br /> First quarter 2000 groundwater monitoring and sampling was also performed during this <br /> reporting period <br /> NEXT QUARTER ACTIVITIES <br /> First quarter 2000 groundwater monitoring report will be issued and second quarter <br /> sampling will be performed <br /> 3100405A/1QOOQSR 1 April 25,2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.