My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012326
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:11:09 PM
Creation date
5/5/2020 12:09:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012326
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> Quarterly Summary Report <br /> . First Quarter 1996 <br /> Former Unocal Service Station 2859 <br /> 1665 Pacific Avenue <br /> Stockton, California <br /> County STID 4 None <br /> County San Joaquin <br /> BACKGROUND <br /> Underground storage tanks removed in March 1988 From March 1988 through <br /> November 1994, a total of 12 on-site and 3 off-site borings were drilled, 4 on-site <br /> momtonng wells, 3 on-site soil vapor extraction (SVE) wells, and 5 off-site monitoring <br /> wells were installed Analytical results indicate that soil near the eastern dispenser island <br /> contains gasoline hydrocarbons and groundwater has been impacted with gasoline <br /> hydrocarbons A work plan to initiate a 6-month SVE test was submitted on April 14, <br /> 1995 A 30-day public notification for air permitting was initiated, and an air permit to <br /> construct was received in December <br /> RECENT QUARTER ACTIVITIES <br /> Quarterly groundwater monitoring and sampling were performed in February 1996 The <br /> SVE remedial system was constructed in January 1996 Start-up and operation of the <br /> • SVE remedial system was initiated, and a report documenting startup activities of the <br /> groundwater monitoring system was submitted to Unocal in January <br /> NEXT QUARTER ACTIVITIES <br /> Second quarter 1996 groundwater monitoring and sampling will be performed A <br /> remedial performance summary report documenting SVE system performance in the first <br /> quarter 1996 will be submitted <br /> CHARACTERIZATION/R.ENIEDIAL STATUS <br /> Soil contamination delineated? Yes <br /> Dissolved groundwater delineated? Yes <br /> Separate-phase hydrocarbons delineated? Not applicable <br /> Amount of hydrocarbon contaminant recovered this quarter? Approximately 600 lbs <br /> -Soil remediation in progress? Yes <br /> Anticipated start date? January 1996 <br /> Anticipated completion date? Second Quarter 1996 <br /> Dissolved/Separate-phase hydrocarbons remediation in progress? No <br /> Anticipated start? Not applicable <br /> Anticipated completion? Not applicable <br /> Is CONSULTANT Pacific Environmental Group, Inc <br /> 3100405A/1Q96QSR 1 Apnl 18, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.