My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012329
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:13:26 PM
Creation date
5/5/2020 12:10:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012329
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br /> Quarterly Summary Report 1 <br /> . Third Quarter 1995 <br /> Unocal Service Station 2859 <br /> 1665 Pacific Avenue <br /> Stockton, California <br /> County STID # None <br /> County San Joaquin _ <br /> BACKGROUND <br /> Underground storage tanks removed in March 1988 From March 1988 through February <br /> 1992 twelve on-site and three off-site borings were drilled, and four on-site monitoring <br /> wells, three on-site soil vapor extraction (SVE) wells, and three off'-site morutonng wells <br /> were installed Analytical results indicate that soil near the eastern dispenser island <br /> contains gasoline hydrocarbons and groundwater has been impacted with gasoline <br /> hydrocarbons A work plan to initiate a 6-month SVE test was submitted on April 14, <br /> 1995 <br /> RECENT QUARTER ACTIVITIES <br /> Quarterly groundwater monitoring and sampling were performed in August 1995 Air <br /> . permitting process was initiated However, due to the proximity of a public school to the <br /> site, a 60-day public notification process was required prior to issuance of an air permit <br /> NEXT QUARTER ACTIVITIES <br /> Fourth quarter 1995 groundwater monitoring and sampling will be performed The <br /> remedial system will be constructed upon receipt of an air permit <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contanunation delineated? Yes <br /> Dissolved groundwater delineated? Yes <br /> Separate-phase hydrocarbons delineated? Not applicable <br /> Amount of groundwater contaminant recovered this quarter? None <br /> Soil remediation in progress? No <br /> Anticipated start date? Fourth Quarter 1995 <br /> Anticipated completion date? Unknown <br /> Dissolved/Separate-phase hydrocarbons remediation in progress? No <br /> Anticipated start? Not applicable <br /> Anticipated completion? Not applicable <br /> CONSULTANT Pacific Environmental Group, Inc <br /> �y <br /> 3109403B/3Q95QSR 1 October 13, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.