My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012350
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:14:01 PM
Creation date
5/5/2020 12:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012350
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Summary Report <br /> First Quarter 1995 pLgr�ggjy <br /> Unocal Service Station 2859 <br /> zo <br /> 1665 Pacific Avenue MM p 11995 <br /> Stockton, California <br /> County STID # None ENVIRONMENTAL HEALTH <br /> County San Joaquin PERMfT/SERVICES <br /> BACKGROUND <br /> Underground storage tanks removed in March 1988 From March 1988 through February <br /> 1992 twelve on-site and three off-site borings were drilled, and four on-site monitoring <br /> wells, three on-site vapor extraction wells, and three off-site monitoring wells were <br /> installed Analytical results indicate that soil near the eastern dispenser island contains <br /> gasoline hydrocarbons and groundwater has been impacted with gasoline hydrocarbons <br /> RECENT QUARTER ACTIVITIES <br /> Quarterly groundwater monitoring and sampling were performed in February 1995 Work <br /> was initiated regarding a 6 month field study to address remediation of hydrocarbon <br /> impacted soil and groundwater detected beneath the site <br /> . NEXT QUARTER ACTIVITIES <br /> Second quarter 1995 groundwater monitoring and sampling will be performed A work <br /> plan will be submitted that will define activities to be conducted during the 6 month <br /> remedial field study at the site , <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Sod contamination delineated? Yes <br /> Dissolved groundwater delineated? Yes <br /> Free product delineated? Not applicable <br /> Amount of groundwater contaminant recovered this quarter? None <br /> Soil remediation in progress? No <br /> Anticipated start date? Unknown <br /> Anticipated completion date? Unknown <br /> Dissolved/free product remediation in progress? No <br /> Anticipated start? Not applicable <br /> Anticipated completion? Not applicable <br /> CONSULTANT Pacific Environmental Group, Inc <br /> • <br /> 31004002/IQ95QSR I April 19, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.