My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012362
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:20:42 PM
Creation date
5/5/2020 12:15:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012362
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Summary Report <br /> Second Quarter 1994 <br /> i <br /> Unocal Service Station 2859 <br /> 1665 Pacific Avenue ' <br /> Stockton, California <br /> County STID # None <br /> County San Joaquin <br /> BACKGROUND <br /> Underground storage tanks removed in March 1988 From March 1988 through <br /> February 1992 twelve on-site and three off-site borings were drilled, and four on-site <br /> monitoring wells, three on-site vapor extraction wells, and three off-site monitoring <br /> wells were installed, Analytical results indicate that soil near the eastern dispenser <br /> island contains gasoline hydrocarbons and groundwater has been impacted with <br /> gasoline hydrocarbons <br /> RECENT QUARTER ACTIVITIES <br /> Unocal has obtained an off-site encroachment agreement to install two groundwater <br /> monitoring wells south and east of the site Second quarter 1994 quarterly <br /> groundwater monitoring and sampling were performed on May 23, 1994 <br /> NEXT QUARTER ACTIVITIES <br /> Quarterly groundwater monitoring and sampling will be performed by MPDS <br /> Services in August 1994 Two off-site groundwater monitoring wells will be installed ' <br /> in July 1994, for the delineation of dissolved hydrocarbons <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contamination delineated9 Yeo <br /> Dissolved groundwater delineated? No <br /> Free product delineated? Not applicable <br /> Amount of groundwater contaminant recovered this quarter? None <br /> Soil remediation in progress? No <br /> Anticipated start date? Unknown <br /> Anticipated completion date) Unknown <br /> Dissolved/free product remediation in progress? No <br /> Anticipated starts Not applicable <br /> Anticipated completion? Not applicable - <br /> CONSULTANT Pacific Environmental Group, Inc <br /> r <br /> 1 <br /> 31004002/2Q940SR ] July 18, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.