My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012368
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:30:35 PM
Creation date
5/5/2020 12:19:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012368
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling <br /> of groundwater samples prior to analysis by the analytical laboratory Prior to sample collection, <br /> the type of analysis to be performed is determined Loss prevention of volatile compounds is <br /> controlled and sample preservation for subsequent analysis is maintained <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using a MMC <br /> flexi-dip interface probe or equivalent Product thickness, if present, is measured to the nearest 0 01 <br /> foot and is noted in the field notes In addition, static water level measurements are collected with <br /> the interface probe and are also recorded in the field notes <br /> After water levels are collected and prior to sampling, each well is purged a minimum of three well <br /> casing volumes of water using pre-cleaned pumps (stack, suction, Grundfos), or polyvinyl chloride <br /> bailers Temperature, pH and electrical conductivity are measured a minimum of three tunes during <br /> the purging Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from <br /> the bailer into appropriate containers. Pre-preserved containers, supplied by analytical laboratories, <br /> are used when possible When pre-preserved containers are not available, the laboratory is instructed <br /> to preserve the sample as appropriate Duplicate samples are collected for the laboratory to use in <br /> maintaining quality assurance/quality control standards The samples are labeled to include the job <br /> number, sample identification, collection date and time, analysis, preservation (if any), and the <br /> sample collector's initials The water samples are placed in a cooler, maintained at 4oC for transport <br /> to the laboratory Once collected to the field, all samples are maintained under chain of custody until <br /> delivered to the laboratory <br /> The chain of custody document includes the job number, type of preservation, if any, analysis <br /> requested, sample identification, date and time collected, and the sample collector's name The chain <br /> of custody is signed and dated (including time of transfer) by each person who receives or surrenders <br /> the samples, begmnmg with the field personnel and ending with the laboratory personnel <br /> As requested by Unocal, the purge water and decontamination water generated during sampling <br /> activities is transported to Tosco - San Francisco Area Refinery, located in Rodeo, California <br /> N lunoaA\farmslstandard pro 1198 <br />
The URL can be used to link to this page
Your browser does not support the video tag.