My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012370
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012370
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:23:22 PM
Creation date
5/5/2020 12:21:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012370
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Summary Report <br /> . Second Quarter 1996 <br /> Former Unocal Service Station 2859 <br /> 1665 Pacific Avenue <br /> Stockton, Califorrua <br /> County STID 9 None <br /> County San Joaquin <br /> BACKGROUND <br /> Underground storage tanks removed in March 1988 From March 1988 through Novem- <br /> ber 1994, a total of 12 on-site and 3 off-site bonngs were dnlled, 4 on-site monitoring <br /> wells, 3 on-site soil vapor extraction (SVE) wells, and 5 off-site monitoring wells were <br /> installed Analytical results indicate that soil near the eastern dispenser island contains <br /> gasoline hydrocarbons and groundwater has been impacted with gasoline hydrocarbons <br /> A work plan to initiate a 6-month SVE test was submitted on July 14, 1995 A 30-day <br /> public notification for air pernutting was initiated, and an air permit to construct was re- <br /> ceived in December The SVE remedial system was constructed in January 1996 Start-up <br /> and operation of the SVE re-medial system was initiated, and a report documenting <br /> startup activities of the ground-water momtonng system was submitted to Unocal in Janu- <br /> ary The SVE system was designed to operate as a 6-month pilot test <br /> RECENT QUARTER ACTIVITIES <br /> Quarterly groundwater monitoring and sampling were performed in May 1996 A remedial <br /> performance summary report documenting SVE system performance in the first quarter <br /> 1996 was submitted Operation and maintanence of the remedial system was performed <br /> NEXT QUARTER ACTIVITIES <br /> Third quarter 1996 groundwater monitoring and sampling will be performed in August <br /> Operation and maintenance of the SVE system will continue through August 1996 Uno- <br /> cal will evaluate the effectiveness of the SVE remedial system to determine a long-term <br /> site strategy <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contamination dehneated? Yes <br /> Dissolved groundwater delineated? Yes <br /> Separate-phase hydrocarbons delineated? Not applicable <br /> Amount of hydrocarbon contaminant recovered this quarter? Approximately 600 lbs <br /> Soil remediation in progress? Yes <br /> Start date? January 1996 <br /> • Anticipated completion date? August 1996 <br /> Dissolved/Separate-phase hydrocarbons remediation in progress? No <br /> 3100405A/2Q96QSR l My 18, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.