17 ✓ <br /> 5. RESULTS <br /> 5.9 MONITORING WELL INSTALLATION <br /> ' Boring NP-1 was advanced to a total depth of 92 feet bgs at the Site While the <br /> ' completion was originally proposed and planned as a nested well completion, grout was <br /> madvertantly smeared in the anticipated depth interval in which the middle nested piezometer <br /> ' would be completed Since the grout would potentially affect the subsequent groundwater <br /> monitoring results, the borehole was grouted up to the surface As a replacement for the <br /> effort, a second well (MW-10) was drilled 5 feet away from NP-1 in order to place a well <br /> screen across the original depth interval of interest NP-1 is a 1" PVC well screened from 90 <br /> ' to 85 feet bgs MW 10 is screened from 50 to 60 ft bgs Well boring logs, completion <br /> detads,and diagrams for installed wells NP-1 and MW-10 are shown in Appendix F <br /> 5.2 SITE SUBSURFACE STRATIGRAPHY <br /> Boring NP-1, terminated at 92 feet bgs, is the deepest boring advanced at the Site to <br /> ' date Previously, tempest boring at the Site had_been advanced to_55-feet.bgs The <br /> lithology of the soils encountered between ground surface and 55 feet bgs was consistent with <br /> ' that reported in previous Site environmental investigations Between 55 ft bgs and 92 ft bgs, <br /> layers of clayey fine sands, clayey silts, and silts were observed <br /> ' The hthology of the soil layers encountered in MW-10 was not logged at the tune of <br /> drilling MW-10 was installed as a replacement boring to facilitate mstallation of the planned <br /> middle nested well onginally intended to be completed in NP-1 MW-10 is located 5 feet away <br /> from NP-1 <br /> 1 <br />