My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012407
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:47:38 PM
Creation date
5/5/2020 12:52:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012407
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' . ARCADIS GERAGHTY&MILLER <br /> ' REPORT <br /> Following completion of the scope of work proposed in this workplan, an <br /> investigation report and CAP will be prepared and submitted to the SJCPHS. The <br /> ' report will summarize field methodologies used along with findings and conclusions <br /> for this investigation The report will also contain tables summarizing analytical <br /> results, a site map showing the piezometer Iocation, boring log and piezometer <br /> ' construction details, copies of all necessary permits to perform the proposed scope <br /> of work, copies of all analytical results,and the CAP. As indicated above,the CAP <br /> will include an assessment of the vertical and lateral groundwater impacts in the site <br /> vicinity,a feasibility study,and applicable cleanup levels <br /> ' SCHEDULE <br /> Unocal and its consultant will proceed with this scope of work following <br /> ' receipt of written approval of this workplan from the SJCPHS. It is anticipated that <br /> fieldwork will commence within two weeks following receipt of all applicable <br /> permits The report will be submitted to the SJCPHS within eight weeks following <br /> ' receipt of all investigation data <br /> If you have any questions or comments regarding this workplan, please <br /> contact Dr Stephen Cullen at(805)687-7559 <br /> Sincerely, <br /> ' ARCADI&Geraghty&Miller,Inc <br /> r <br /> Pmhazice - <br /> ' Project cientist <br /> �j <br />� 1 <br /> Wa a Allmon,R.G No 6386 <br /> I <br /> ' Principal Scientist <br /> ' Dr Ste en en,Ph.D <br /> Principal Scientist <br /> ' Attachments Figures I &2 <br /> Field Methodology <br /> p„r� Page <br /> %,aM S",ffA_BARBARAICATA"RO_SOC)%UNOCALIC VALLEY%WPS_REV%PACWKP2A.DOC 8/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.