Laserfiche WebLink
at ambient air temperatures for approximately IS minutes. At the end of this time the <br /> ' probe of the PID/FID will be inserted into the container and the sample OVL will be <br /> measured and recorded on the boring logs. <br /> ' During drilling operations, a modified split-spoon sampler (sampler) will be used to <br /> retrieve soil samples. Pre-cleaned brass sleeves are placed inside the sampler and the <br /> ' sampler is then driven to the desired sampling depth. The sampler is then recovered <br /> from inside the boring and the brass sleeves retrieved. The brass sleeves will be used to <br /> evaluate soil type and to measure OVLs present in the sample interval Soil type and <br /> ' OVLs will be recorded on the boring logs. Procedures for PID calibration and OVL <br /> monitoring will be followed as described in the previous section. Soil cuttings, if any, <br /> will be placed in properly labeled 55-gallon drams and stored on site pending disposal. <br /> ' A.4 Groundwater Sampling <br /> Groundwater samples will be collected using a Hydropunch-or similar sampling <br /> device. The Hydropunch-will be pushed into the water-bearing zone by the drill rig and <br /> the water sample will be collected from the Hydropunch—using a clean,Teflon bailer and <br /> will be transferred to pre-cleaned bottles provided by the laboratory. All samples will be <br /> ' stored in a cooler containing ice for transport under proper chain-of-custody protocol to the <br /> laboratory. A maximum of 45 minutes will be allowed for a sufficient volume of <br /> groundwater to collect in the Hydropunchl"prior to advancing to the next depth <br /> All groundwater sampling equipment will be thoroughly cleaned prior to and following <br /> use All decontamination water will be placed in 55-gallon drums,which will be properly <br /> ' labeled and left on site pending disposal. <br /> A.v Piezometer Installation <br /> ' The nested piezometers will each consist of I-inch diameter schedule 40 PVC <br /> casing with a 5-foot screen interval of 0.020-inch slotted casing The exact depth of the <br /> ' screen intervals will be determined by the field geologist based on site specific lithology <br /> and constituent distribution information. Lonestar#3 said, or equivalent, will be used as <br /> the filter pack adjacent to each screened interval and will extend a minimum of 2 feet <br /> above and 6 inches below the screened interval. If possible, a minimum of 10 feet of a <br /> ' cement/bentonite grout mixture will be tremied into the borehole to separate the shallow <br /> and deep screened zones. A bentonite seal comprised of a minimum thickness of 3 feet <br /> will be tremied into the borehole above the upper filter pack, followed by a <br /> ' cement/bentonite grout mixture tremied into the remaining portion of the annular space. <br /> The borehole will be completed at the surface with a traffic-rated well monument. <br /> Following completion of the piezometer installation activities,the location of the <br /> nested piezometer will be surveyed by a California-certified land surveyor. Northing <br /> and easting information,along with ground surface elevation of both piezometers will be <br /> ' collected. The piezometers will be developed at a minimum of 72 hours following <br /> • completion of piezometer constructionA bailer will be used to remove the water and <br /> suspended sediments from the well casing. Daring the development, purged <br /> groundwater will be monitored for turbidity,pH,conductivity,and temperature. Purging <br /> I <br /> i <br /> purer Page. <br /> ' WW_SANTkEARBARAIDATAIAPRQ_58OVJNOCAL%q VALLEYW#P$_PJ-WACWW2ADOC 11�1I <br /> ARCADIS GERAGHTY&MILLER <br />