My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:42:21 PM
Creation date
5/5/2020 1:29:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> [-01DCOVED <br /> Work Plan Addendum - February 2009 FEB 1 7 2009 <br /> CALIFORNIA FUELS CARDLOCK STATION ENVIRONMENT HEALTH <br /> 2402 Pacific Avenue, Stockton, California PFRMTSFRVICES <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. SCOPE OF WORK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES.. . . . . . . . . . . . . . . . . . . 2 <br /> 2.2. DRILLING AND SAMPLING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2.3. INSTALLATION OF SVE REMEDIATION WELLS (IF WARRANTED). . . . . 4 <br /> 2.4. SOIL VAPOR EXTRACTION REBOUND TEST.. . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 2.5, REPORT PREPARATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.0. FIELD PROCEDURES.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.1. PERMITTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.2. DRILLING ACTIVITIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.2.1. Soil-Vapor Boring Advancement And Sampling. . . . . . . . . . . . . . . . . . . . 5 <br /> 3.2.2. Confirmation Soil Sample Collection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.2.3. Soil Vapor Extraction Well Completion. . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 3.2.4. Well Elevation and Coordinate Survey. . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 3.2.5. Soil Vapor Extraction Well Network Connections. . . . . . . . . . . . . . . . . . . 7 <br /> 3.3. SOIL VAPOR EXTRACTION REBOUND TEST.. . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - TPH-g Impacted Soil: 15ft-20ft <br /> Figure 4 -Proposed Soil Vapor Extraction Well Construction Details (if necessary) <br /> TABLES <br /> Table 1 -Analytical Results of Soil Samples <br /> Table 2 -Analytical Results of Vapor Samples <br /> APPENDICES <br /> Appendix A - San Joaquin County EHD Directive Letter, dated 12 January 2009 <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.