Laserfiche WebLink
09 March 1998 <br /> • AGE-NC Project No 95-0173 <br /> Page 5 of 5 <br /> 5 0. RECOMMENDATIONS <br /> Based upon data collected during January 1998, AGE recommends the following <br /> • Installation of ground water monitoring wells south of MW-9, northwest of MW-6 and east <br /> of soil boring B9 (near the intersection of Bonnie Lane and Castle Street) <br /> a Discontinue analysis of TPH-d during future sampling events <br /> • Continued quarterly ground water monitoring and sampling The next quarterly monitoring <br /> and sampling is scheduled for April 1998 <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points (e g soil and ground water samples), and subsurface conditions may vary <br /> away from these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> Advanced GeoEn%iranmental,Inc <br />