Laserfiche WebLink
� M • <br /> 2) Collect and analyze soil samples from the soil borings at fire foot intervals, <br /> collect water samples from the monitoring wells, and analyze these samples <br /> for TPH as gasoline, BTEX, and organic lead The analyses will be performed <br /> using EPA Methods 8015;8020, and California Department of Health Scrr ices <br /> (CDHS) Method for organic lead <br /> 3) Monitor the water lc%cl and free product thickness in the wells <br /> 4) Rc%icw well records within 114 mile of the site to assess local water quality, <br /> and ci aluatc the groundwater gradient <br /> 5) Describe subsurface soils encountered while drilling <br />' 6) LN aluatc laborator} data to assess the extent of contamination in light of the <br /> local and site hydrogcologic conditions <br />' 7) Complete a Prcliminar} Site Assessment Report summarizing the analytical <br /> laborator}'s results and our field findings <br />' 1.6 Workplan Content <br /> Section 20 (Field Nicthods) of this workplan describes the field methods used to <br /> install the borcholes, wells and sample soil and groundwater samples from the site <br /> Section 30 (Anal}tical Testing) describes the anal}tical protocols used on this <br /> project, the number of soil and groundwater samples, and a rationale for the <br /> chemical testing program Section 40 (Data Interpretation) describes the approach <br /> used to assess the extent and impact of subsurface hydrocarbons at the site Section <br /> 50 (Project Schedule) describes the schedule underwhich the work will be <br /> conducted Figures and tables are included in the text <br /> 1 <br /> I <br /> 1 <br /> 7 <br />