Laserfiche WebLink
2.4 Monitoring Well Construction <br /> Groundwater monitoring wells will be constructed in the soil boreholes described <br /> abo%c The wells will designed to monitor both free phase liquid and dissolved phase <br /> by drocarbons Thcy will be constructed with 4-inch diameter schedule 40 PVC <br /> casing, with threaded ends and factory screening The casings will extend the full <br /> length of the borings The wclls will be scaled with a bottom cap and screened to <br /> approxiinatcly 10 feet aboi c and below the highest anticipated groundwatcr lc"cl <br /> Filter packs, which consist of No 3 Monterey sand, will be placed bctwccn the well � <br /> casing and the annular space of the borehole The filter pack will extend 12-24 <br /> inches aboNc the top of the well screen, followcd by one foot of hydratcd bcntonitc <br /> b�� Ncat cement "ill be placed abo%c the hydratcd bentonite to the ground surface The <br /> screened casing slot size will be 0 020 inch The well seal will be a minimum of 5 feet <br /> long NAIcll heads will be scaled with a locking watertight co%cr The surface lc-,el <br /> cicN ation will be sure cycd to 001-inch with reference to a local datum by a licensed <br /> sun cyor The well number, installation date, construction details, will be marked on <br /> the inside of the lid of the well cap A diagram of a typical. well completion is <br />' prop idcd as Figure 2-1 California Fuels well construction and soil sampling summary <br /> op <br /> is pridcd in Table 2-1 ;4e <br /> 2.5 Well Surveying <br /> The location and cic%ation of the top of casing of the monitoring wells will be <br /> sure cycd to mean sea ]c,cl using the City of Stockton Datum by a licensed <br /> suricyor familiar with the site This information will be used with the water <br /> lc�cl data collected as described below, to determine the cic�ation of the water <br /> leici and groundwater flow direction beneath the site <br /> oh- <br /> 2.6 Well De,,elopment � <br /> The newly constructed monitoring wells "ill be dc,. eloped by or erpumping <br /> using a surge block until the discharge water is rclativcly free of settleable solids <br /> The turbidity of the discharge watcr will be measured during do-sclopment All well <br /> deN clopmcnt equipment coming into contact with groundwatcr will be <br /> decontaminated by washing in an Alconox solution followcd by tap and dcionized <br /> w atcr rinses Dc%clopmcnt water w ill be collected in 55-gallon drums at the site until <br /> groundwatcr chemistry results arc rcceiN cd for c%aluation of disposal requirements <br /> 2.7 Field Documentation <br /> % dedicated field notebook will be used to record significant field cr cnts All <br /> entries shall be made in the field and corrections will be made using a single line to <br /> cross out errors The field notebook will note the arra al of the drilling crew, <br /> drilling time, the depth to water, lithologic descriptions, F isual observation of <br /> contamination, and weather conditions <br /> 9 <br />