Laserfiche WebLink
1 i <br /> ` TABLE OF CONTENTS <br /> 1.0. INTRODUCTION AND SCOPE OF WORK I <br />' 2.0. PROCEDURES 1 <br /> 21 DRILLING ACTIVITIES JUNE 1998 1 <br />' 2 1 1 Soil Sample Collection I <br /> 2 1 2 Equipment Decontamination 2 <br /> 213 Logging 2 <br />' 2 1 4 Monitoring Well Completion 3 <br /> 2 15 Surveying of Monitoring Wells 3 <br /> 2 1 6 Well Development 3 <br />' 22 QUARTERLY MONITORING AND SAMPLING ACTIVITIES 4 <br /> 3.0. FINDINGS 4 <br /> 3 1 SOIL PROFILE 5 <br /> 32 FIELD EVIDENCE OF HYDROCARBON-IMPACTED SOIL AND GROUND <br /> WATER 5 <br /> 33 QUARTERLY GROUND WATER ELEVATION AND GRADIENT 5 <br /> 34 RESULTS OF SOIL SAMPLE ANALYSIS 5 <br />'• 3 5 RESULTS OF GROUND WATER SAMPLE ANALYSIS 6 <br /> 4.0. SUMMARY AND CONCLUSIONS 6 <br /> t5.0. RECOMMENDATIONS 8 <br />' 6.0. LIMITATIONS 8 <br />' FIGURES <br /> Figure I -Location Map <br />' Figure 2 -Site Plan <br /> Figure 3 - Well Construction Diagram MW-5 <br /> Figure 4 - Well Construction Diagram MW-6 <br /> Fimin 5 - Well Cnnctmirtinn n7e7aram AlfW-7 <br /> Figure 6 -Relative Ground Water Elevation Map <br /> Figure 7 -Approximate Extent of Dissolved MTBE <br /> • <br /> 1 <br />