My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005443
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
ARCHIVED REPORTS_XR0005443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:30:44 PM
Creation date
5/5/2020 1:39:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005443
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 i <br /> ` TABLE OF CONTENTS <br /> 1.0. INTRODUCTION AND SCOPE OF WORK I <br />' 2.0. PROCEDURES 1 <br /> 21 DRILLING ACTIVITIES JUNE 1998 1 <br />' 2 1 1 Soil Sample Collection I <br /> 2 1 2 Equipment Decontamination 2 <br /> 213 Logging 2 <br />' 2 1 4 Monitoring Well Completion 3 <br /> 2 15 Surveying of Monitoring Wells 3 <br /> 2 1 6 Well Development 3 <br />' 22 QUARTERLY MONITORING AND SAMPLING ACTIVITIES 4 <br /> 3.0. FINDINGS 4 <br /> 3 1 SOIL PROFILE 5 <br /> 32 FIELD EVIDENCE OF HYDROCARBON-IMPACTED SOIL AND GROUND <br /> WATER 5 <br /> 33 QUARTERLY GROUND WATER ELEVATION AND GRADIENT 5 <br /> 34 RESULTS OF SOIL SAMPLE ANALYSIS 5 <br />'• 3 5 RESULTS OF GROUND WATER SAMPLE ANALYSIS 6 <br /> 4.0. SUMMARY AND CONCLUSIONS 6 <br /> t5.0. RECOMMENDATIONS 8 <br />' 6.0. LIMITATIONS 8 <br />' FIGURES <br /> Figure I -Location Map <br />' Figure 2 -Site Plan <br /> Figure 3 - Well Construction Diagram MW-5 <br /> Figure 4 - Well Construction Diagram MW-6 <br /> Fimin 5 - Well Cnnctmirtinn n7e7aram AlfW-7 <br /> Figure 6 -Relative Ground Water Elevation Map <br /> Figure 7 -Approximate Extent of Dissolved MTBE <br /> • <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.