My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:26:18 PM
Creation date
5/5/2020 1:57:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 6
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
515
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Industrial Compliance <br /> 9719 Lincoln Village Drive,Suite 310 Sacramento, CA 95627 9161369-8971 FAX 916/369-8370 <br /> — <br /> . <br /> August 25, 1993 '`1 <br /> AUG 30 ;c93 <br /> _ IC Project No. 05100254 <br /> Mr. Jag Tar <br /> Engineering Technician <br /> City of Tracy, Department of Public Works VIA OVERNIGHT MAIL <br /> 520 Tracy Boulevard <br /> Tracy, California 95376 <br /> Re: Encroachment Permit Application for Piezometer Well <br /> Southern Pacific Transportation Company <br /> Tracy Yard - Tracy, California <br /> Dear Mr. Jazl tar: 1J In tir-� <br /> On behalf of Southern Pacific Transportation Company (SPTCo), Industrial Compliance (IC) <br /> is submitting the attached encroachment permit application and a check in the amount of <br /> $115.00 to install a piezometer well located adjacent to the SPTCo Tracy Yard; Tracy, <br /> California. The location of the piezometer well was discussed between you and Mr. Mike <br /> Purcell (IC) in your office on August 2, 1993 as is shown on the attached Figure 1. <br /> The encroachment permit explains the required conditions for performing work at this <br /> property. In addition to the provisions of this encroachment permit, you have requested the <br /> following special conditions: <br /> * Any item or structure including underground utilities disturbed or <br /> damaged during the construction shall be restored to its original <br /> condition by IC at its own expense. <br /> * If after the well is constructed, the well location interferes with the new <br /> alignment of MacArthur Drive, IC will abandon the well within 2 <br /> weeks of receipt of written notification from the City of Tracy. If the <br /> well location does not interfere with the new alignment of MacArthur <br /> Drive, the well can be abandoned anytime between the date of <br /> installation and December 31, 1994. <br /> * It is the responsibility of IC to perform a utility location survey prior to <br /> installing the piezometer well. <br /> * IC will provide a performance bond for this work in the amount of <br /> $2,000.00 that will be released when the piezometer well is abandoned. <br /> TRACY222.LTR/09-25-93/C:\MSD\TRACY <br /> Dedicated to solving your environmental problems. <br /> A Subsidiary of SP Environmental Systems,Inc. HNEWA <br />
The URL can be used to link to this page
Your browser does not support the video tag.