My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:26:18 PM
Creation date
5/5/2020 1:57:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 6
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
515
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 Historical Product Measurement and Thickness <br /> Union Pacific Railroad Company <br /> Former Tracy Maintenance Facility <br /> Tracy,California <br /> Depth to Product Product <br /> Well Date Product Depth to Water Thickness Volume <br /> Identification Measured (feet btc) (feet btc) (inches) (gal) Comments <br /> PZ-01 10/12/2005 10.00 10.10 1.20 0.02 Replace sock <br /> PZ-01 10/28/2005 10.05 10.06 0.12 0.0 Remove sock <br /> PZ-01 11/7/2005 10.21 10.29 0.96 0.01 <br /> PZ-01 11/30/2005 10.33 10.35 0.24 0.0 <br /> PZ-01 12/16/2005 10.5 10.51 0.12 0.0 Trace product <br /> PZ-01 12/29/2005 10.13 10.14 0.12 0.0 <br /> PZ-01 1/9/2006 9.86 9.91 0.60 0.01 Install sock <br /> PZ-01 1/31/2006 ND 10.29 0.0 0.0 Remove sock <br /> PZ-01 2/14/2006 ND 10.31 0.0 0.0 <br /> PZ-01 2/21/2006 ND 10.31 0.0 0.0 <br /> PZ-01 3/8/2006 ND 10.25 0.0 0.0 <br /> PZ-01 3/23/2006 ND 10.10 0.0 0.0 <br /> PZ-01 4/17/2006 9.81 9.95 1.68 0.02 Install sock <br /> PZ-01 4/27/2006 10.1 10.11 0.12 0.00 Remove sock <br /> PZ-01 5/10/2006 10.24 10.30 0.72 0.01 Install sock <br /> PZ-01 5/26/2006 ND 9.92 0.00 0.00 Remove sock <br /> PZ-01 6/13/2006 ND 8.81 0.00 0.00 <br /> PZ-02 12/19/94 9.85 10.70 10.20 0.14 Prior to PZ-2 well development. <br /> PZ-02 12/19/94 12.91 12.94 0.36 0.00 End of PZ-2 well development. <br /> PZ-02 12/22/94 8.95 10.55 19.20 0.26 Prior to purging MW-11A. <br /> End of purging MW-11A-350 gallons-38 well <br /> PZ-02 12/22/94 10.29 10.57 3.36 0.05 volumes. <br /> PZ-02 1/03/95 8.79 10.49 20.40 0.28 Prior to purging MW-11A. <br /> End of purging MW-11A-190 gallons-21 well <br /> PZ-02 1/03/95 10.01 10.47 5.52 0.08 volumes. <br /> Collect samples for density and viscosity <br /> PZ-02 1/25/95 NM NM NM NM measurements. <br /> PZ-02 1/31/95 8.95 10.52 18.84 0.26 Remove product from PZ-2. <br /> PZ-02 3/03/95 9.54 10.18 7.68 0.10 Measurement of free product layer. <br /> PZ-02 3/16/95 9.05 11.50 29.40 0.40 Product removed by bailer. <br /> PZ-02 4/06/95 9.25 10.90 19.80 0.27 Product removed by bailer. <br /> PZ-02 5/15/95 9.52 10.96 17.28 0.23 Product removed by bailer. <br /> PZ-02 6/26/95 8.80 9.10 3.60 0.05 Product removed by bailer. <br /> PZ-02 7/11/95 8.00 8.34 4.08 0.06 Product removed by bailer. <br /> PZ-02 7/25/95 8.22 8.60 4.56 0.06 Measurement of free product layer. <br /> PZ-02 9/06/95 9.46 10.32 10.32 0.14 Measurement of free product layer. <br /> PZ-02 9/30/95 9.78 10.73 11.40 0.16 Measurement of free product layer. <br /> PZ-02 10/31/95 9.85 10.68 9.96 0.14 Measurement of free product layer. <br /> PZ-02 11/28/95 9.93 11.02 13.08 0.18 Product removed by bailer. <br /> PZ-02 12/27/95 9.21 9.74 6.36 0.09 Install Nochar bilge bags. <br /> Bilge bags removed approximately 0.45 lb.of <br /> PZ-02 1/25/96 9.25 9.48 2.76 0.04 product. Remove and replace bilge bag. <br /> Product visible along entire length of bilge bag. <br /> PZ-02 2/19/96 8.64 8.76 1.44 0.02 Calculated weight of diesel removed was 1.00 lb. <br /> PZ-02 3/15/96 - - - - Bilge bags weighed and Remove and replaced. <br /> PZ-02 5/13/96 8.30 8.31 0.12 0.00 Measure product and Remove and replace bilge bag. <br /> Measure product. Calculated weight of diesel <br /> PZ-02 7/15/96 8.54 8.59 0.60 0.01 removed was 0.25 lb. <br /> PZ-02 7/25/96 - - - - Remove and replace bilge bag. <br /> PZ-02 11/14/96 8.82 8.95 1.56 0.02 Measure product. Remove and replace bilge bag. <br /> PZ-02 2/11/97 7.83 8.14 3.72 0.05 Measurement of free product layer. <br /> PZ-02 2/24/97 - - - - Remove and replace bilge bag. <br /> PZ-02 5/22/97 7.79 7.82 0.36 0.00 Measure product thickness. Remove and replace <br /> PZ-02 7/28/97 8.19 8.20 0.12 0.00 Measure product thickness. Remove and replace <br /> PZ-02 10/31/97 9.31 9.32 0.12 0.00 Measure product thickness. Remove and replace <br /> PZ-02 2/04/98 7.01 7.59 6.96 0.09 Measure product thickness. Remove and replace <br /> PZ-02 5/11/98 7.53 8.02 5.88 0.08 Measure product thickness. Remove and replace <br /> PZ-02 7/27/98 8.00 8.44 5.28 0.07 Measure product thickness. Remove and replace <br /> PZ-02 12/01/98 9.12 9.71 7.08 0.10 Measure product thickness. Remove and replace <br /> PZ-02 2/02/99 8.79 8.98 2.28 0.03 Measure product thickness. Remove and replace <br /> PZ-02 5/11/99 9.07 9.57 6.00 0.08 Measure product thickness. Remove and replace <br /> ERM Page 5 of 16 UPRR/0020500.56-8/24/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.