My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006041
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
ARCHIVED REPORTS_XR0006041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:54:19 PM
Creation date
5/5/2020 1:59:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006041
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Water Aquifer Pumping Test Report-July 2003 <br /> CALIFORNIA FUELS CARDLOCK STATION <br /> 2442 Pacific Avenue, Stockton, California <br /> 1.0. INTRODUCTION <br /> Advanced GeoEnvironmental,Inc (AGE)has prepared this ground water aquifer pumping test report <br /> for 2402 Pacific Avenue, Stockton, California(site) The report documents procedures and results <br /> for installation of one ground water extraction well and performance of ground water aquifer <br />' pumping tests at the site in July 2003 The site setting is illustrated on Figure 1 Site structures and <br /> monitoring well locations are depicted on Figure 2 <br /> The ground water pumping tests consisted of extracting ground water from "Hydrologic Unit 2," <br /> which was informally identified in Cone Penetrometer Testing Site Investigation -Fourth Quarter <br /> 2001, dated 19 February 2002 as a potential hydrogeologic unit between 38 and 65 feet bsg The <br />' objectives of the tests were to (1) obtain general ground water aquifer characteristics and (2) to <br /> evaluate aquifer response to ground water extraction This report is prepared in accordance with <br /> guidelines established by the California Regional Water Quality Control Board - Central Valley <br /> Division for investigation of underground storage tank (UST) sites A summary of previous <br /> investigations at the site was included in Remedial Action Work Plan (RA WP) dated 30 December <br /> 1998, prepared by AGE <br /> • The following is a brief summary of events for installation of the above ground water extraction well <br /> and performance of the above ground water aquifer pump testing <br /> 20 January2003 - Soil boring for ground water extraction well (EW-1) advanced to 65 feet <br /> g <br /> below surface grade(bsg), soil samples collected every five feet between 15 and 65 feet bsg, <br /> soil boring EW-1 was completed as a six-inch diameter ground water extraction well <br /> screened between 40 and 65 feet bsg <br /> 0 09 July 2003 - performance of a `step' variable rate ground water aquifer pump test <br /> • 11 July 2003 -Performance of a five gallons per minute (GPM) constant rate ground water <br /> aquifer pump test <br /> 2.0. DRILLING AND SAMPLING PROCEDURES <br /> On 20 January 2003, one ground water extraction well (EW-1) was installed at the site for <br /> performance of a ground water pumping test Ground water extraction well installation procedures <br /> for the site were outlined in Revisions to Work Plan Addendum, dated 06 November 2002,prepared <br /> by AGE and approved by the San Joaquin County Environmcntal Health Department(SJCEHD)by <br /> • Advanced GeoEnwronmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.