My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNION PACIFIC RAILROAD COMPANY <br /> TRACY RAIL YARD <br /> TRACY, CALIFORNIA <br /> DUAL PHASE EXTRACTION SYSTEM <br /> JANUARY , 1998 <br /> INDEX TO DRAWINGS <br /> DRAWING NO. SHEET NO. DRAWING TITLE <br /> D-8032.25-01 T-1 LOCATION MAP, INDEX TO DRAWINGS B <br /> S <br /> 13 81 2.25-02 &I CONCEPTUAL SITE PLAN, SOIL VAPOR EXTRACTION g �i <br /> D-8032.25-03 G-2 CONCEPTUAL SITE PLAN, GROUND WATER EXTRACTION <br /> s <br /> D-8032.2504 PA LEGEND TO PROCESS DIAGRAMS <br /> D43032.25-05 P-2 PROCESS FLOW DIAGRAM <br /> D-8032.25-06 P-3 PIPING & INSTRUMENTATION DIAGRAM, GROUND WATER <br /> EXTRACTION (SHEET 1 OF 3) v a " AV <br /> D-8032.25-07 P-+ PIPING & INSTRUMENTATION DIAGRAM, GROUND WATER <br /> TREATMENT (SHEET 2 OF 3) <br /> D4W2.25-08 PS PIPING & INSTRUMENTATION DIAGRAM, VAPOR 11TH 6t <br /> x <br /> im/ sr imN sr <br /> TREATMENT (SHEET 3 OF 3) dddd <br /> D-8032.25-09 CA EXISTING SITE PLAN ' <br /> D-8032.25-10 C-2 EXTRACTION SYSTEM PLAN - DUAL PHASE EXTRACTION TR.4CY SITE <br /> D-8032.25-11 C3 EXTRACTION SYSTEM PLAN - SOIL VAPOR EXTRACTION <br /> D-8032.25-12 C-4 GROUND WATER INFILTRATION PLAN � TE m <br /> D4 032.25-13 05 WELL CONSTRUCTION DETAILS <br /> D-BW2.25-14 C-6 DUAL PHASE/SOIL VAPOR EXTRACTION PIPING DETAILS ff SANJOAQUIIV <br /> D-8032.25-15 G7 GROUND WATER INFILTRATION TRENCH AND PIPING SCOUAW <br /> DETAILS <br /> D-8032.25-16 C$ EQUIPMENT PEDESTALS AND CONTAINMENT CURB, <br /> PLAN AND SECTIONS <br /> D-8032.25-17 M-1 EQUIPMENT AND PIPING LAYOUT <br /> 04WZ25-18 M-2 DUAL PHASE/SOIL VAPOR EXTRACTION WELL VAULT <br /> DETAILS <br /> D-8032.25-19 &I POWER DISTRIBUTION SYSTEM SINGLE-LINE DIAGRAM LOCATIQN MAP <br /> AND MCC ARRANGEMENT SCALE: 1 " = 2 MILES <br /> ` 7E REQ/ISION APPR'D REV BY <br /> REV <br /> yAt& P , INDF{ TO DRAWINGS <br /> AS NOTED I '�.�ZHs7EiTEN � iONSTETEN D-8032.25 —01 SHEET <br /> i - �1 13/98 CHENBURUAN. P. Ja. OUINN. P.E. 8032.25 1 0( 19 <br /> IF SHEET IS LESS THAN 22" Dx34" � ` <br /> DUAL PHASE EXTRACTION SYSTEM No"E <br /> R IS A REDUCED PRINT — y111 UNION PACIFIC RAIL YARD T._ y <br /> SCALE REDUCED ACCOPP" ' - a TRACY, CALIFORNIA <br /> c:\an\owr ' ENVIRCINNf +VIAL RESOURCES MANAOEACEW • WEST <br />
The URL can be used to link to this page
Your browser does not support the video tag.