My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4 <br /> OBJECTIVES AND DESIGN BASIS FOR THE <br /> REMEDIAL ACTION <br /> This section describes the overall remediation objectives for this remedial <br /> action and presents the technical design basis for achieving the <br /> remediation objectives. This section concludes with a discussion of <br /> specific objectives for the remediation of site soil and A-zone ground <br /> water. <br /> Overall Objectives of the Remedial Action <br /> The overall objectives for remedial action at the site are: <br /> • To remove HVOC chemical constituents in vadose zone soil which <br /> represent a source of impacts to A-zone ground water at the site. <br /> • To remove floating product at the site which represents a source of <br /> petroleum hydrocarbon impacts to A-zone ground water. <br /> • To control migration of the HVOC and AVOC plumes in A-zone <br /> ground water at the site by ground water extraction both within the <br /> plume source area and at the plume margin, and treat extracted <br /> ground water prior to reinjection. <br /> The technical design basis for implementing each of these remedial <br /> objectives is described in the following subsections. <br /> Technical Design Basis for Vadose Zone Remediation <br /> Factors involved with establishing the technical design basis for vadose <br /> zone soil remediation at the site include: <br /> • The presence of low permeability soils; and, <br /> • Chemical constituent type and distribution in soil. <br /> 4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.