My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installed to the base of the A-zone (approximately 25 feet) and screened <br /> from 10 feet bgs to 24.5 feet bgs. Each extraction well will be constructed <br /> of 4-inch-diameter, Schedule 40 PVC blank casing, and 4-inch-diameter, <br /> Schedule 40 PVC screen with 0.020 inch machine slots. The construction <br /> schematic for the plume margin ground water extraction wells is shown <br /> on Drawing C-5. <br /> Each margin extraction well will house a submersible, air-displacement <br /> type, bottom loading, ground water extraction pump. Each pump will <br /> have a 3-inch-diameter, fiberglass reinforced plastic body, with internal <br /> mechanical switches. Pump operation will be controlled by the internal <br /> switches and by the hydrostatic pressure of recharging ground water. <br /> During "off-cycle" of the pumps, ground water flows into the pump casing <br /> under hydrostatic pressure until it trips an internal mechanical switch <br /> whereby the compressed air supply is opened. The compressed air <br /> displaces ground water from within the pump casing and to above <br /> ground conveyance piping. <br /> Plume margin ground water extraction wells will be completed above <br /> ground surface within 24-inch-diameter stovepipes with concrete skirts. <br /> The wellhead assemblies for the extraction wells will include a connection <br /> to compressed air supply with a pressure regulator, a ground water <br /> sample port, a pump cycle counter, and flow control valves. <br /> Extraction System Process Piping <br /> Process piping for dual phase extraction wells will be 2-inch-diameter, <br /> schedule 40 PVC. This pipe diameter size is selected such that adequate <br /> velocity of the extracted vapor/liquid stream is maintained. <br /> SVE well process piping will be 2-inch-diameter Schedule 40 PVC, as this <br /> pipe size is adequate for expected soil vapor flowrates. Existing process <br /> piping will be utilized for transfer of ground water extracted at plume <br /> margin wells to the Treatment Svstem. <br /> Process piping layouts are shown in Drawings C-2 and C-3. <br /> 5-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.