My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 <br /> OPERATION AND MONITORING OF THE <br /> REMEDIAL ACTION <br /> This section presents the following operating and monitoring procedures <br /> associated with implementation of the remedial action: <br /> • Procedures for tuning and operating the dual phase extraction <br /> wells to achieve the desired vapor/liquid ratio in the extracted <br /> stream; <br /> • Pulsed operating procedures at dual phase and SVE wells; and, <br /> • The ground water and soil vapor monitoring program that will be <br /> conducted to document attainment of treatment objectives for <br /> vadose zone soil remediation and capture and treatment of the <br /> A-zone ground water VOC plume. <br /> The Treatment System equipment operation and maintenance procedures <br /> will be compiled in an Operation and Maintenance Plan (O&M Plan), <br /> which will be prepared during system construction. The O&M Plan will <br /> be appended to the construction implementation report, discussed in <br /> Section 7. <br /> Dual Phase Extraction Well Tuning <br /> The extraction tubes will be positioned within the dual phase extraction <br /> wells such that a vapor flow rate of approximately 15 scfm and ground <br /> water flowrate of approximately 4 gpm per extraction well is achieved. <br /> These flow conditions will establish the RVIs and ground water ROIs as <br /> described in Section 3, and will ensure that adequate velocities are <br /> established within each extraction tube for the in-situ stripping of VOCs <br /> from ground water within the extraction tubes. <br /> To achieve required flow conditions, extraction tubes will be placed <br /> slightly above the static water table. If the tube is positioned lower within <br /> the water table, a greater quantity of ground water will be withdrawn, <br /> 6-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.