My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Well Screen: Two(2) inch diameter,schedule 40 PVC,flush threaded, <br /> 0.020 inch slot,as indicated. <br /> 3. Sand Pack: Clean,washed,Colorado silica sand,size 8/12. <br /> 4. Bentonite Seal: Mixture of 3/8 inch diameter bentonite chips and potable <br /> water. <br /> a. Bentonite chips and potable water shall be added in lifts <br /> not to exceed 1 foot thickness following hydration of <br /> bentonite chips. <br /> b. Following placement of each lift,and prior to initiation <br /> of the hydration period,each lift shall be tamped in <br /> place around the well casing. <br /> C. Each lift shall be allowed to hydrate for a period of 15 <br /> . utes prior to placement of successive lifts. <br /> B. Soil Vapor Monitoring Probe: <br /> 1. Casing: Low Density Polyethylene tubing,0.24 inch outer diameter. <br /> 2. Screen: Double woven stainless steel wire screen. Six(6)inch length, <br /> 0.25 inch inner diameter. Screen pore size: 0.0057 inch. <br /> 3. Screen Filter Material: 50 to 100 mesh glass beads. <br /> 4. Bentonite Seal: Bentonite powder and potable water. <br /> a. Bentonite powder and potable water shall be added in lifts not to <br /> exceed 1 foot thickness following hydration of bentonite powder. <br /> b. Each lift shall be allowed to hydrate for a period of 15 minutes <br /> prior to placement of successive lifts. <br /> 2.2 SURFACE COMPLETION MATERIALS <br /> A. Ground Water Piezometer. <br /> 1. Carbon steel standpipe,hot-dipped galvanized,hinged lid,with hasp and <br /> staple for locking with standard padlock. <br /> A. Soil Vapor Monitoring Probe: <br /> 1. Well Box: H-20 traffic rated monitoring well box,water resistant lid. <br /> 2. Lid and Frame: Bolt-down,cast iron lid,machined flat bearing surface, <br /> gasket seal,steel frame. <br /> 02672-2 ERM 10/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.